
The worker moves between the isolated valve and the transport connection, pressing a palm to each trembling pipe. The pump house smells of oil and wet metal as pressure builds unevenly.

The Worker at the Controls
Witness this adjustment. I am opening the clean line by a finger’s width, then checking whether the transport accepts pressure without drawing from the contaminated side.
Nessa bends over the ledger and records the valve position, the pressure reading, and the time. Rowan keeps one hand near the emergency shutoff, watching the aging gauges.

Nessa
The contaminated line remains isolated. I have marked this as a test only, not an approved draw from the depot reserve.

Rowan
Keep it brief. If the transport connection leaks or the pump loses prime, we could spend the remaining clean reserve before anyone can close the valve.
The worker turns the valve another fraction. Somewhere beneath the floor, the clean line knocks twice, and the transport’s dormant starter gives a faint mechanical click.

The Worker at the Controls
Pressure is reaching the transport, but the return gauge is climbing too fast. I can hold it here, or shut down and preserve what remains.
✓ Quest Accepted
Keep the transport operational
Elysandra's turn“I inspect the transport connection for leaks while the pressure holds.”
SUCCESS (Great Repair, rolled -1)

Elysandra opens the battered red tool box, its chipped paint bright beneath the pump-house grime, and selects a small inspection mirror and spanner from the basic kit.
She works along the transport connection while pressure holds, checking the coupling, return seam, and valve stem. The mirror catches no wet shine, and every joint stays dry.
At the lowest coupling, the spanner finds a faint vibration but no leak. Elysandra braces the fitting with the lucky wrench, then tightens the retaining nut with a controlled turn.

The Worker at the Controls
The return gauge is easing. Pressure is reaching the transport without drawing from the contaminated line.
Nessa compares the gauge position with her ledger while Rowan watches the emergency shutoff. The transport connection holds cleanly, with no seepage, hiss, or pressure loss.

Nessa
Record it as a successful pressure test. The clean line is sound, and the contaminated side remains isolated.
The worker eases the valve back to its marked position. Elysandra closes the tool box and rests the lucky wrench beside the panel, leaving the verified connection ready for the next witnessed decision.
Quest Complete
ElysandraKeep the transport operational